Scratch, Scuff or Rub Mark: Repairing Anodized and Painted Aluminum Storefront (and When the Frame Has to Be Replaced)
A rub mark, a scuff, or a scratch through the finish on anodized or painted aluminum storefront: which ones clean off, which touch up, and when the frame is a replacement.
Read More arrow_right_alt
No Exceptions Taken Is Not a Release: What a New PM Has to Close Out Between Approval and Fabrication
No exceptions taken and approved as noted mean the architect agrees with the drawings. They do not mean the shop can build from them. The four things a new PM closes out between approval and fabrication, and the one question to ask before any release.
Read More arrow_right_alt
Where Do the Wires Go? Power Transfers, Electrified Hinges, and the Wiring Path for Electrified Door Hardware
Electrified door hardware fails between the ceiling and the door, not at the device. How power reaches the header, crosses to the door through an EPT or electrified hinge, and why every prep has to be resolved before fabrication.
Read More arrow_right_alt
The Shop Drawing Review Checklist: 5 Things to Check Before You Release a Glazing Package to Fabrication
A five-item shop drawing review checklist for glazing packages: dimensions, quantities, finishes, hardware and preps, open items. Check it before the shop cuts.
Read More arrow_right_alt
The 5 Most Expensive Assumptions a Glazing PM Makes Before Fabrication
The rough opening is probably right, the field can make it work, the finish is close enough: five PM assumptions before fabrication, what each costs, and what to check.
Read More arrow_right_alt
South. No, North. Wait, We Need These 5 Pieces First: How Changing Phased Releases Disrupts Fabrication Scheduling
How changing phased releases disrupts fabrication scheduling: the cut-list drop, machining batches, staging, and packaging, and how to communicate a priority change early.
Read More arrow_right_alt
The Rough Opening Doesn’t Match the Drawings: Modify On Site, Send It Back, or Remake?
When the rough opening is outside construction tolerances: remeasure, find what changed, then weigh modifying on site, sending the frame back, or a remake.
Read More arrow_right_alt
Before You Release That Entrance: 6 Storefront Door Hardware and Frame Details That Cause the Most Problems
Storefront door hardware release checklist: handing, stile width, offset pivots, closers, thresholds, hardware prep. Settle all six before the shop cuts a stile.
Read More arrow_right_alt
What Belongs in a Fabrication Release: Fabrication Drawings, Door Hardware Schedule, Finish Schedule, and the Stuff Fabricators Keep Asking For
What a complete aluminum fabrication release contains: fabrication drawings, the current door hardware schedule, a finish schedule, and a one-page cover sheet.
Read More arrow_right_alt
Knocked Down or Preassembled? How Your Storefront Fabrication Should Arrive at the Jobsite
Knocked down or preassembled? How aluminum storefront should arrive for installation: eight factors that decide it, and how to bundle and tag it for the crew.
Read More arrow_right_alt